Stratal CAD

Revisions and revision tables

Help centre · Sheets, plotting and exchange

Record each revision of a drawing with what changed and who approved it, show the history in a revision table, and tag revision clouds with their revision letter. For anyone issuing controlled drawings.

Before you start

Steps: add a revision

  1. Run REVISION. At "Revision [Add/List/Cloud]", press Enter for Add.
  2. At "Revision", press Enter for the next letter, or type your own. Letters skip I, O and Q; numbers count up.
  3. At "Description of the change:", type what changed.
  4. At "Approved by", type the name, or press Enter to keep the one shown.
  5. The revision is dated today. The drawing property Revision changes to it, and the history is kept as the properties Revision.1, Revision.2 and so on.

Steps: place a revision table

  1. Run REVTABLE and place the table.
  2. Each later REVISION keeps the table up to date.

Steps: tie revision clouds to a revision

  1. Draw the clouds round the changes with REVCLOUD.
  2. Select them and run REVISION, then choose Cloud.
  3. Each cloud gets a triangle tag with the current revision in it. Tying it again later replaces the tag.

Options

Option What it does
Add Adds a revision (letter, description, approver, today's date).
List Shows the history, and how many clouds each revision has.
Cloud Ties the selected clouds to the current revision.

Example

A drawing at revision A changes a bracket's hole size. Draw a cloud round the hole with REVCLOUD, run REVISION, press Enter to accept B, type "Hole changed from 8.5 to 9 mm", and give the approver. Then select the cloud, run REVISION and choose Cloud. The table shows B with today's date, and the cloud carries a B triangle.

Tips and common mistakes

Related

Related

Still stuck? Open a support ticket or use Help, then Contact support in Stratal CAD.