Stratal CAD

Plugin for Stratal CAD · Utilities

Utilities & Telecoms

Plan, trace and record duct, chamber and fibre networks. Chambers, duct routes and cables as live objects, fibre splices and splice diagrams, clearance checks against existing services, quantities, as-built records and register exports.

£249 per year

Made in Stratal CAD

Larkspur Avenue FTTP network, Thornbury Green (fictional)

A full-fibre network for a fictional 20-house cul-de-sac: chambers, duct routes, cables and a building entry at every house, with a two-level PON (1:8 then 1:4 splitters) traced to each premises with its loss budget. The same drawing gives trench sections, chamber details with BS EN 124 covers, a clean design check, clearances against the surveyed services, a priced bill and the network as 3D solids.

Made on 12 November 2026 with Stratal CAD 0.1.8 and Utilities & Telecoms 0.12.0; later versions have changes since. The job and its names are fictional. Pictures are resized only, not retouched; the figures are the software's own output.

The houses in the renders are plain blocks standing in for the plots; the network is the plugin's own 3D at depth.

The model in 3D

Render made in Stratal CAD: LB01, the aggregation joint with the 1:8 splitters, and its ducts.

The picture above is a render made in Stratal CAD: LB01, the aggregation joint with the 1:8 splitters, and its ducts (see the render larger). The live model is the job's own glTF file (1.2 MB, 22,436 triangles), fetched only when you press the button and drawn in your browser with simple shading, so its colours and lighting are plainer than the render. Click or tap the model to take control (the page scrolls past it until you do), then drag to turn it, right-drag or Shift-drag to move it, and use the wheel or a pinch to zoom; press Escape or click outside to let go.

The job in numbers

Chambers (20 building entries)
38
Duct routes
38 routes, 547.7 m
Cables
23 (48F feeder, 2 x 12F, 20 x 2F drops)
Optical splitters
12 (2 x 1:8, 10 x 1:4), 30 of 56 ports used
Premises fed from a splitter port
20 of 20
Worst PON loss (example figures)
18.89 dB, margin 9.11 dB of 28 dB
Design check (UTCHECK)
0 errors, 0 warnings, 12 notes
Clearance conflicts (UTCONFLICT)
30
Footway trench
349.35 m
54 mm duct
614.00 m
Priced bill (example rates)
GBP 59,615.76
Network solids (UT3D)
367 (228 chamber, 80 duct, 59 cable)
Register export (UTNUAR)
99 assets, WGS 84
A1 sheets
7

Pictures

Drawing sheets

Preview of a drawing sheet made in Stratal CAD: PON, splitters and splices: splice diagrams, loss budget per end, ports and premises. (opens a larger view)
PON, splitters and splices: splice diagrams, loss budget per end, ports and premises
Preview of a drawing sheet made in Stratal CAD: Trench sections and chamber details at 1:20. (opens a larger view)
Trench sections and chamber details at 1:20
Preview of a drawing sheet made in Stratal CAD: Network plan with the surveyed services and conflicts at 1:250. (opens a larger view)
Network plan with the surveyed services and conflicts at 1:250
Preview of a drawing sheet made in Stratal CAD: Chamber and cable schedules and the priced bill. (opens a larger view)
Chamber and cable schedules and the priced bill
Preview of a drawing sheet made in Stratal CAD: Clearances, survey register, as-built and design check. (opens a larger view)
Clearances, survey register, as-built and design check
Preview of a drawing sheet made in Stratal CAD: Turning head detail at 1:50. (opens a larger view)
Turning head detail at 1:50

Shown in this job

  • Drawing's own network library (UTLIBRARY): a crossing chamber, wall box and shared trench
  • Whole-network design check (UTCHECK) taken from 20 warnings to clean
  • Priced bill of quantities from your own rates (UTCOST)
  • Splitter ports and premises fed (UTPORTS)
  • Optical splitters 1:8 and 1:4 and PON traces with loss budgets (UTSPLITTER, UTPON)
  • Chambers, ducts and cables as 3D solids at depth (UT3D), web model
  • Chamber depth and cover details with BS EN 124 classes and chamber schedule (UTCHAMBERDETAIL)
  • Trench cross-sections (UTSECTION)
  • Text sized for the plot scale (UTTEXT), building entries, soft dig and moling
  • As-built depths with a quality level; survey levels based on PAS 128 (not certified compliance)
  • Clearances by gap between duct and service bodies, services named by tag and owner
  • Splices, splice diagrams, cable and splice schedules, tracing, duct fill, GeoJSON and register export

What it does

New in 0.14.0

Added on 21 November 2026, with Stratal CAD 0.2.5.

  • UTPULL works out cable pulling tension route by route, both ways, with friction, weight, bends and sidewall pressure against your cable limits (CSV).
  • UTDRUM cuts each cable into drum lengths jointed in chambers and packs the pieces onto drums of your length (CSV).
  • UTCAPACITY counts the fibres spliced or on splitters and those spare, by cable and by route (CSV).
  • UTEXCAV totals excavation, backfill, spoil with your bulking factor and the surface to reinstate, by trench type (CSV).

Build the network

Chambers, ducts and cables that stay connected.

  • UTCHAMBER: manholes and joint boxes, with inside depth and a BS EN 124 cover class
  • UTDUCT: duct routes between chambers, by count and size; UTTRENCH sets each segment's trench type
  • UTCABLE: cables through the routes, with fibre count and slack
  • UTSPLIT and UTJOIN: split a route with a new chamber, or join two; cables run through
  • MOVE and ROTATE carry routes and cables with their chambers; UTUPDATE catches other changes

Trace it

Follow the network and every fibre.

  • UTTRACE: everything connected, the shortest path between chambers, separate parts
  • UTFLOW: flow direction per route, for upstream and downstream traces
  • UTFILL: duct fill by bore area, with cables allocated to ducts
  • UTFIBRE: a fibre followed end to end through its splices, with its colours

Fibre design

Splices, splitters and loss budgets.

  • UTSPLICE: splices in a chamber, with the 12-colour sequence
  • UTDIAGRAM: a chamber's splice diagram, cables in and out with every fibre
  • UTSPLITTER: optical splitters from 1:2 to 1:64 in a chamber
  • UTPON: a fibre traced down through splitters as a tree, with each end's loss budget
  • UTSCHED: cable and splice schedules as CSV
  • UTPORTS: each splitter's ports and the premises they feed

Check against other services

Clearances before anyone digs.

  • UTCLEAR: a quick plan check to other services by layer and distance
  • UTCONFLICT: a clearance table by layer or object property, with approaches, crossings, angles and vertical separation
  • Depths from as-built measurements, survey records or the trench design, and the report says which
  • UTSURVEY: survey quality levels based on PAS 128 (not certified compliance), with a register and report

Drawings and quantities

From the plan to the details.

  • UTQTY: chambers, trench by type, duct by size and cable by type, in the panel and as CSV
  • UTSECTION: a trench cross-section of a route segment, with the cover to the ducts
  • UTCHAMBERDETAIL: a chamber's depth and cover detail, or the chamber schedule
  • UTTEXT: tags and labels sized for your plot scale
  • UTCHECK: a whole-network design check; UTCOST: a priced bill of quantities from your own rates
  • UTLIBRARY: the drawing's own chamber, wall box and trench types
  • UT3D: chambers, ducts and cables as 3D solids at their depths

Records and exchange

As-built, evidence and the register.

  • UTASBUILT: as-built records on chambers, routes and cables, with a quality level per measured depth and a progress report
  • UTEVIDENCE: link photos and documents to objects
  • UTEXPORT: the network as CSV with WKT, or GeoJSON in WGS 84 where the drawing is georeferenced
  • UTNUAR: GeoJSON for the national underground asset register, attributes named by your field map

Key commands

UTCHAMBERPlace chambers and joint boxes
UTDUCTA duct route between chambers: count and size of ducts
UTCABLEA cable through duct routes: type and fibres
UTTRACEEverything connected, the shortest path between chambers, separate parts
UTFILLDuct fill by bore area with cables allocated to ducts; chamber occupancy
UTSPLICEFibre splices in a chamber: add, list or delete
UTFIBREA fibre followed end to end through the splices, with its colours
UTDIAGRAMA chamber's splice diagram: cables in and out, fibres with their colours and the splices
UTSPLITTEROptical splitters (1:2 to 1:64) in a chamber
UTPONA fibre traced through splices and splitters as a tree, with each end's loss budget
UTCONFLICTClearance table against other services: approaches, crossings, angles and vertical separation
UTQTYChambers, trench, duct and cable quantities: panel and CSV
UTSURVEYSurvey quality levels based on PAS 128 (not certified compliance)
UTASBUILTAs-built records on chambers, routes and cables, and the progress report
UTNUARGeoJSON for the national underground asset register
UT3DChambers, ducts and cables as 3D solids at their depths
UTCHECKCheck the whole network's design
UTCOSTPrice the network's quantities from your own rates
UTPROPSEvery property of the selected chambers, duct routes or cables, in the Network properties dock and at the command line
UTAPPLYWrite the properties typed in the Network properties dock, as one undo step
UTPONSCHEMATICDraw a fibre's PON tree as a schematic: splices, splitters with ratios and ports, every end's premises and loss budget; run again or Update to redraw
UTPULLCable pulling tension route by route, both ways: friction, weight and bends, sidewall pressure, against your cable limits (CSV)
UTDRUMCut each cable into drum lengths jointed in chambers and pack the pieces onto drums of your length (CSV)
UTCAPACITYFibres spliced or on splitters and those spare, by cable and by route (CSV)
UTEXCAVExcavation, backfill, spoil with your bulking factor and the surface to reinstate, by trench type (CSV)

Specifications

Version0.14.0 (the job above was made with 0.12.0 and Stratal CAD 0.1.8; later versions have changes since)
Network objectsChambers with depth and BS EN 124 cover class; duct routes with a trench type per segment; cables with fibres and slack
Fibre12-colour sequence; one-to-one splices; splitters 1:2 to 1:64 with PON loss budgets
ClearancesRules by layer or object property; approaches, crossings, angles and vertical separation between duct and service
Output filesCSV: quantities, schedules, conflicts, duct fill, as-built and survey register. CSV with WKT, GeoJSON (RFC 7946) and a register GeoJSON with your field map
On the drawingChamber and route symbols with trench edges, cables, splice diagrams, trench sections and chamber details; 3D solids with UT3D
CoordinatesLongitude and latitude in WGS 84 where the drawing has a coordinate system
RequiresStratal CAD 0.1.7 or later on Windows 11 (x64), with a licence that includes Utilities & Telecoms
DeliveryA Stratal-signed plugin, installed from the Plugins menu; runs in Stratal CAD or isolated in its own process

Limitations

The street, houses, network and existing services in the pictures are fictional. Clearance values in the example table are not a standard: use the asset owners' own.

Add it to Stratal CAD

Utilities & Telecoms runs inside Stratal CAD and stays with your licence.