Place tables, fill their cells with text and spreadsheet-style formulas, and edit rows and columns in a grid. For schedules, legends, bills of quantities and any tabular information.
Before you start
- A licence that includes 2D drafting.
Steps: create a table
- Click Annotate > Tables > Table (
TABLE, aliasesTB,-TABLE). - At "Enter number of columns <3>" and "Enter number of data rows <3>" type the sizes.
- At "Specify insertion point (top-left corner)" click the table's top-left corner. Before that click you can type
H(Height) for the text height andW(Width) for the column width.
The new table has a header row and empty cells. If a table style is current, the table uses it.
Steps: fill cells
- Click Annotate > Tables > Edit table (
TABLEDIT). - At "Pick a table cell" click a cell, then type its text at "Enter text for cell B2 (= starts a formula)".
- Pick the next cell. Press Enter to finish. All the edits are one undo step.
Steps: edit the whole table
- Select the table.
- In the Properties panel, click Edit Table….
- Edit any cell in the grid, insert or delete rows and columns, set each column's alignment and the title, and switch the header row on or off.
Formulas follow the cells they name when you insert or delete rows and columns. A formula naming a deleted cell
shows #REF!. The Properties panel also edits the title and header row directly.
Formulas
A cell starting with = is a formula.
- Numbers, cells (
B3,$B$3),+ - * / ^and brackets. SUM,AVERAGE(orAVG),MIN,MAXandCOUNTover ranges (=SUM(D2:D9)) or values.- Rows are numbered from 1 and columns lettered from A over all cells, the header row included, as in a spreadsheet. Text and empty cells in a range are skipped.
| Shown | Meaning |
|---|---|
#REF! |
The formula names a cell outside the table. |
#VALUE! |
Text was used in arithmetic. |
#DIV/0! |
Division by zero, or AVERAGE of no numbers. |
#CYCLE! |
The formula depends on itself. |
#ERROR! |
The formula cannot be read. |
Example
A door schedule with Width in column B and Qty in column C: in D2 type =B2*C2 and copy the idea down the rows.
At the bottom, in D7, type =SUM(D2:D6).
Tips and common mistakes
- Remember the header row is row 1, so the first data row is row 2.
- A column keeps the width TABLE gave it. In a table from a CSV file or a schedule, columns are as wide as their text.
- Tables plot, and are written to DXF as their lines and text.
Troubleshooting
| Message or symptom | What it means and what to do |
|---|---|
| "Enter a whole number from 1 to ..." | The column or row count is out of range. |
| "Pick a cell of a table." | TABLEDIT's click missed the table. |
| "Pick inside a cell (the title is a property of the table)." | Change the title in Properties or Edit Table…. |
| "The cells of a ... come from its source; they cannot be typed." | The table is linked to a file or is a schedule. Edit the source instead. |
Related
- Linked tables, schedules and spreadsheet files
- Table styles, merged cells and cell formatting
- Finding text and checking spelling
Related
- Plotting a drawing to PDF
- Printing and plotting a drawing
- Setting up a sheet set
- Publishing and printing a sheet set
- Importing and exporting DXF
- Importing and exporting IFC
Still stuck? Open a support ticket or use Help, then Contact support in Stratal CAD.